Sign In | Join Free | My gimpguru.org |
|
Brand Name : unitedwin
Model Number : UW
Place of Origin : CHINA
MOQ : 1 set
Price : USD
Supply Ability : 3 sets/ month
Delivery Time : 3 months
Name : Artificial Grass Lawn Plastic Tape Extrusion Line Machine Plastic lawn monofilament Line
Application : PP,PE
Scew RPM. : 20-100r/min
Processing type : Extruding machine
SJJ Winder speed : 280m/min
SHW Winder speed : 400m/min
Tex.Range : 60-200tex
Weight : 30T
ALT-LK140 Solid Mask Machine+Nose Strip
Main Features:
1. Screw and barrel are made of nitride steel 38CrMoAl with special hardening, with a good corrosion resistance and wear resistance
2. AC Invertor & Motor which synchronizes the entire extruder.
3. Latest technology used to force the melt into the die very effectivelypressure double crank to control the die opening and closing.
4. Stretch roller : Power source is gear reducer, more stable operation for a long time,
the continuity of the work. Last longer than cheap cycloid reducer. Roll surface is plated more than 0.08mm thickness chromium.
Main Technical Parameters:
Item | SJPL-D/S90×33-1000 | SJPL-D/S100×33-1100 | SJPL-D/S110×33-1300 | SJPL-D/S120×33-1500 |
Max.Extrusion | 280kg/h | 320kg/h | 420kg/h | 500kg/h |
Screw Dia. | Φ90mm | Φ110mm | Φ120mm | Φ130mm |
Scew RPM. | 20-100r/min | 20-100r/min | 20-100r/min | 20-100r/min |
T Die Head Lip length | 900mm | 1100mm | 1300mm | 1500mm |
SJJ Winder speed | 280m/min | 280m/min | 280m/min | 280m/min |
SHW Winder speed | 400m/min | 400m/min | 400m/min | 400m/min |
Tex.Range | 60-200tex | 60-200tex | 60-200tex | 60-200tex |
Winder No.S | 280 | 340 | 410 | 480 |
Power | 320KW | 350KW | 400KW | 450KW |
Size | 40000×3500×2600 | 42000×3500×2600 | 45000×3500×2600 | 48000×3500×2600 |
Weight | 30T | 35T | 40T | 48T |
Applications:
Company information
FAQ:
1. How long will your engineer reach our factory?
Within one week after everything ready (machine arrival your factory, non-woven material, power source, air compressor etc. Prepared)
2. How many days will you finish installing?
We will finish installation and training within 15 days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.
4. How long is your machine's warranty period?
All our machine has one year guarantee for electricity parts and two years guarantee for mechanism, starting from finished installation.
5. How could you do if the parts broken within warranty?
We would express the free replacement parts during the warranty date
6. How could you do after one year warranty period?
We also can-do service for you, but you need pay salary for our technicians 80USD/day for each person.
7. What is your terms of payment ?
30% T/T in advance ,balance before shipment.
![]() |
Monofilament 100r/Min Artificial Grass Production Line For Pe / Pp Images |